📦 Q4 2026 production calendar is open · book before August 15 to ship before peak season · Request a Quote
Manufacturing Capabilities

From sheet steel to sealed container — under one roof.

We control every stage of production in a single 50,000 m² facility in Hangzhou. That means consistent quality, predictable lead times, and no margin for finger-pointing between subcontractors.

Production Capacity

Built for serious volumes.

CAPACITY

1.2M units / month

Sustainable monthly output across our six product categories, running three shifts.

LINES

14 production lines

Stainless steel forming, plastic injection, glass assembly, decoration, packaging.

STAFF

320+ employees

Including 22 R&D engineers and 28 dedicated quality control inspectors.

AREA

50,000 m² facility

Production, warehousing, sample room, QC lab, and export logistics on one site.

Production line workers in uniform inspecting stainless thermoses
Stainless Steel Line

The vacuum thermos production process.

Our stainless line is what we are known for. Every thermos passes through 18 production steps and 4 quality checkpoints before it reaches the packaging station. The vacuum integrity test alone takes 72 hours.

  • 304 / 316 Sheet FormingDeep-drawn cylinders, laser-welded seams. No glue, no compromise.
  • Vacuum Chamber SealingTwo-stage pumping, induction sealing. Tested to 24-hour hold.
  • Powder Coat / Spray BoothDust-free climate-controlled cabin. Pantone-matched, baked to 220°C.
  • Lid Assembly & Drop TestCaps assembled, gasketed, and drop-tested by line before pairing.
From Quote to Container

Your timeline, step by step.

Days 1–3

Quote & Mockup

You send specs and artwork. We send a quote, mockup, and decoration recommendation within 24 business hours.

Days 4–14

Sample & Approval

Pre-production sample produced and shipped to you (or photo+video sign-off if shipping isn't practical). Approve before tooling.

Days 14–18

Mass Production Start

30% deposit triggers production booking. Raw material lock-in and tooling cut, if custom.

Days 25–35

QC & Shipment

AQL 2.5 final inspection, photo/video evidence, 70% balance against B/L copy. Container loaded.

Custom Packaging

From poly bag to retail-ready.

Packaging is part of the product. We design and produce in-house: from $0.05 poly bags for promotional runs to $5.00 magnetic gift boxes with custom foam inserts for premium retail launches.

  • Individual Poly BagStandard. Optional brand sticker, EAN label, FNSKU for Amazon.
  • Offset Color BoxGloss, matte, or soft-touch lamination. Spot UV or foil stamping.
  • Premium Magnetic Gift BoxRigid board with magnetic close, ribbon, embossed logo, foam insert.
  • Kraft Mailer (D2C)Subscription-box friendly with tissue, thank-you card, branded tape.
  • Display Cartons / Floor DisplaysPOP units for retail end-caps. Pre-packed for shelf placement.
Premium gift box packaging with custom foam insert and bottle
Rows of branded shipping cartons in a clean warehouse
Export & Logistics

Sea, air, door-to-door — we run all three.

Our in-house export team handles freight booking, customs documentation, certificates of origin, and FBA/3PL prep for North American buyers. You can stay hands-off, or stay in the loop — your call.

  • FOB Ningbo / ShanghaiMost common. You manage freight forwarder from port.
  • CIF Any Major PortWe arrange sea freight + insurance to destination port.
  • DDP Door-to-DoorWe deliver to your warehouse with duties paid. Best for small/mid orders.
  • Amazon FBA PrepFNSKU labeling, polybag, master carton, direct ship to FBA centers in US, UK, DE, IT, FR, ES, JP.
  • Air Freight (Express)For samples and urgent reorders. 5–7 days door-to-door.
Modern Chinese export logistics facility loading containers at golden hour Plan Your Production

Tell us your launch date.
We'll work backwards.

Most buyers come to us 8–12 weeks before they need product in market. Even shorter timelines are doable — we'll be honest about what is and isn't possible.

Start Planning